[1]
Tørset, T. og Meland, S. 2008. Cost Benefit Analysis for safety projects at sea – Does the method give the entire picture? Experience from analysis of the Stad sea tunnel. Artikler fra Trafikdage på Aalborg Universitet. 15, 1 (dec. 2008). DOI:https://doi.org/10.54337/ojs.td.v15i1.5382.