[1]
Schittenhelm, B. and Richter, T. 2009. Railway Timetabling Based on Systematic Follow-up on Realized Railway Operations. Proceedings from the Annual Transport Conference at Aalborg University. 16, 1 (Dec. 2009). DOI:https://doi.org/10.5278/ojs.td.v16i1.5417.