[1]
Tørset, T. and Meland, S. 2008. Cost Benefit Analysis for safety projects at sea – Does the method give the entire picture? Experience from analysis of the Stad sea tunnel. Proceedings from the Annual Transport Conference at Aalborg University. 15, 1 (Dec. 2008). DOI:https://doi.org/10.5278/ojs.td.v15i1.5382.