Schittenhelm, B., & Richter, T. (2009). Railway Timetabling Based on Systematic Follow-up on Realized Railway Operations. Proceedings from the Annual Transport Conference at Aalborg University, 16(1). https://doi.org/10.5278/ojs.td.v16i1.5417