Schittenhelm, B. and Richter, T. (2009) “Railway Timetabling Based on Systematic Follow-up on Realized Railway Operations”, Proceedings from the Annual Transport Conference at Aalborg University, 16(1). doi: 10.5278/ojs.td.v16i1.5417.