Tørset, T. and Meland, S. (2008) “Cost Benefit Analysis for safety projects at sea – Does the method give the entire picture? Experience from analysis of the Stad sea tunnel”, Proceedings from the Annual Transport Conference at Aalborg University, 15(1). doi: 10.5278/ojs.td.v15i1.5382.