Schittenhelm, B., and T. Richter. “Railway Timetabling Based on Systematic Follow-up on Realized Railway Operations”. Proceedings from the Annual Transport Conference at Aalborg University, vol. 16, no. 1, Dec. 2009, doi:10.5278/ojs.td.v16i1.5417.