1.
Tørset T, Meland S. Cost Benefit Analysis for safety projects at sea – Does the method give the entire picture? Experience from analysis of the Stad sea tunnel. td [Internet]. 2008 Dec. 31 [cited 2024 May 9];15(1). Available from: https://journals.aau.dk/index.php/td/article/view/5382