Samfundsøkonomisk analyse af en fast forbindelse over Femern Bælt
DOI:
https://doi.org/10.5278/ojs.td.v11i1.4997Nøgleord:
cost-benefit, transport, fixed link, tunnel, bridgeResumé
The analysis comprises a detailed cost-benefit analysis of a fixed link across the Femern Belt. The analysis is based upon existing detailed traffic forecasts. It is based upon official Danish cost-benefit metodology which is documented in detail in a metodology appendix.
Downloads
Publiceret
31-12-2004
Citation/Eksport
Bøgelund, M. (2004). Samfundsøkonomisk analyse af en fast forbindelse over Femern Bælt. Artikler Fra Trafikdage På Aalborg Universitet, 11(1). https://doi.org/10.5278/ojs.td.v11i1.4997
Nummer
Sektion
Samfundsøkonomi på transportområdet